-
TRIVIA QUESTION?????
Congratulations to @Nick for wining the previous quiz.When was the River Niger Bridge in Onitsha constructed, which company constructed it and how much did it cost to construct?🧐First correct answer wins 2k.💸
Just Login, answer and win 2k daily.😇
15 Comments-
-
The river Niger bridge was constructed in 1966.
The company that constructed it was the Dumez group,a french construction company.
And it cost about 17 million dollars.(£12 million) -
1The River Niger Bridge at Onitsha was constructed between 1964 and 1965 by Dumez- a French construction company and cost £5 million.
-
The river Niger bridge at Onitsha was constructed between 1964 and 1965 by Dumez-a French construction
It cost $200,000 to build?Mr. MERIT yes,sir;would cost $200,000
The 2013 best companies to work ranking include 50 multinationals,45majorty Nigerian companies and 12 government agencies. -
Mungo Park
In 1795 Mungo Park, a Scottish explorer discovered River Niger and the a theory about the origin of the river’s name is that it comes from the Tuareg n’eghirren meaning ‘flowing water.River Niger Bridge was built in 1964-1965. It is notable as the link between South-Eastern Nigeria and Western Nigeria. Built by Dumez, the French…
-
Media
Photos
Videos
Audios
Files
Sorry, no items found.
Friends
Umeh Anthony
@tonic
Martins Kosisochukwu
@ozor
It was carried out by the Netherlands Engineering Consultants of The Hague, Holland (NEDECO) in the 1950s, Between 1964 and 1965, French construction giant, Dumez, constructed the Niger Bridge and theÂ
Construction cost
₦336 Billion